7km Dual HV Cable Installation – Stirling

Cappers Ltd delivered 7km of dual high-voltage cable infrastructure in Stirling, supporting the connection of a major new housing development. Works were carried out primarily within the busy A91 corridor, requiring careful logistics and traffic management planning.

Our scope included:

• Full highway excavation to utility specification

• Installation of dual HV ducting systems

• Cable installation.

• Backfill and resurfacing to SROR specification

Due to the project’s location, night works and weekend operations were essential to safely navigate multiple roundabouts and high-traffic areas. The scheme also included traffic control and excavation across the M9 motorway slip road — completed efficiently with zero installation issues.

Highway reinstatement quality was excellent, with no major defects raised, demonstrating Cappers Ltd’s commitment to safe delivery, compliance, and workmanship excellence.