7km Dual HV Cable Installation – Stirling
Cappers Ltd delivered 7km of dual high-voltage cable infrastructure in Stirling, supporting the connection of a major new housing development. Works were carried out primarily within the busy A91 corridor, requiring careful logistics and traffic management planning.
Our scope included:
• Full highway excavation to utility specification
• Installation of dual HV ducting systems
• Cable installation.
• Backfill and resurfacing to SROR specification
Due to the project’s location, night works and weekend operations were essential to safely navigate multiple roundabouts and high-traffic areas. The scheme also included traffic control and excavation across the M9 motorway slip road — completed efficiently with zero installation issues.
Highway reinstatement quality was excellent, with no major defects raised, demonstrating Cappers Ltd’s commitment to safe delivery, compliance, and workmanship excellence.